Regions

A window is specified to a code before it is specified to a product. The same opening in Florida and in inland Texas carries a different design pressure, a different glazing build and a different hardware schedule, and neither is the default. Seven regions, grouped by the market that governs them.

3 region pages

United States

The United States market page

Florida

United States

Hurricane-force wind and debris impact, salt-laden air on the coast, and extreme heat and sun load on the interior.

Port
Port of Miami / Savannah
Lead time
40–55 days on impact-rated schedules
Florida specification

Texas

United States

Gulf Coast hurricane and debris impact on the coast; high-heat, high-solar interior inland.

Port
Port of Houston
Lead time
35–50 days
Texas specification

Arizona

United States

Extreme heat and high solar gain on the west and south elevations, dust and sand, and large openings for the view.

Port
Los Angeles / Long Beach
Lead time
30–45 days
Arizona specification

4 region pages

Australia & New Zealand

The Australia & New Zealand market page

Queensland

Australia

Cyclonic wind (AS 1170.2, N1–N4, higher in the north), an impact-glazing requirement, and humidity with salt air on the coast.

Port
Port of Brisbane
Lead time
35–50 days depending on wind zone
Queensland specification

New South Wales

Australia

Coastal and inland wind (AS 1170.2), bushfire (AS 3959 BAL) at the interface, acoustic on road frontages, and high project volume.

Port
Port of Sydney
Lead time
35–50 days
New South Wales specification

Victoria

Australia

A mild but four-seasons climate (thermal and condensation control), wind, bushfire (BAL) at the forest and range interface, and a design-led buyer.

Port
Port of Melbourne
Lead time
35–50 days
Victoria specification

Western Australia

Australia

Cyclonic wind in the north, extreme heat and salt air around Perth, and wide-open coastal sites.

Port
Fremantle (Perth)
Lead time
35–50 days
Western Australia specification

The seven regions side by side

Two markets, seven jurisdictions. The wind basis is the line that changes the build; the port is the line that changes the calendar.

RegionMarketGoverning basisPortLead time
FloridaUnited StatesFlorida Building Code (FBC) + Miami-Dade NOA (South FL)Port of Miami / Savannah40–55 days on impact-rated schedules
TexasUnited StatesFBC / IBC where adopted; ASCE 73 impact for the coastal beltPort of Houston35–50 days
ArizonaUnited StatesIECC / ASHRAE 90.1 (Arizona climate zone 3)Los Angeles / Long Beach30–45 days
QueenslandAustralia & New ZealandAS/NZS 1170.2 (wind) + AS 2208 (cyclonic impact) + AS 1288 (glass)Port of Brisbane35–50 days depending on wind zone
New South WalesAustralia & New ZealandAS/NZS 1170.2 (wind) + AS 3959 (bushfire BAL) + AS 1288 (glass)Port of Sydney35–50 days
VictoriaAustralia & New ZealandAS/NZS 1170.2 (wind) + AS 3959 (bushfire BAL) + AS 1288 (glass)Port of Melbourne35–50 days
Western AustraliaAustralia & New ZealandAS/NZS 1170.2 (wind, cyclonic zones in the north) + AS 1288 (glass)Fremantle (Perth)35–50 days

Asked before a region is opened

Why is the region page about the code rather than the product?

Because the code decides the configuration before the product does. Two identical elevations specified to Florida and to inland Texas differ in design pressure, glazing build and hardware schedule. The region page states which document governs and what it changes, so the schedule can be written correctly the first time.

What if my project is in a region you have not written up?

The seven pages cover the states and territories that carry most of our volume, not every jurisdiction. The same system range is supplied anywhere; send the address and the governing code, and the drawing office states the wind and impact basis for that location on the quotation.

Do the lead times differ by region?

They differ by configuration and by port rather than by region as such. Impact-rated schedules run longer than standard casement or tilt-turn work regardless of destination, and the ocean leg varies with the port. The figure on each page is the whole period from approved shop drawings, not the production slot alone.

Where do the standards on these pages come from?

Each page names the standard that governs the region and links it at the publisher on the certifications page. Nothing is quoted from a secondary summary; the number and the edition are written on the schedule as the authority has them.

Prefer to talk it through?

Send a drawing or a one-line brief on WhatsApp.

+86 177 0868 3991 — quotation within 24 hours, shop drawings free in 3 working days.