Windows and doors for Australia & New Zealand

Cyclone-rated to AS 1170.2, acoustic builds for the loud road-frontage, and the timber-inside look the market already wants. Salt-fog hardware is standard, not an option, for coastal sites.

Standards
AS 2047, AS 1288, AS/NZS 1170.2 (wind regions A to D)
Typical projects
Coastal and hinterland residences, acoustic townhouses
Consolidation ports
Melbourne, Sydney, Brisbane, Perth
Lead time
35–50 days depending on wind zone

Systems for this market

All 22 systems

Explore by state / region

4 regional specifications for Australia & New Zealand — each with the local standards, ports and lead times.

Certification path

Configured AU projects are tested to AS 2047, with AS 1288 balustrade glazing and AS 1170.2 wind-zone results issued per project and per model. Cyclonic regions run the structural suite on the configured geometry; the report that ships with the first container is the one for that building.

AS 2047

Sliding door & window performance

Per configured model, on the order

AS 1288

Balustrade glazing (GR-100)

Per project, with the structural calculation

AS/NZS 1170.2

Wind regions A to D; C and D cyclonic

Per geometry, cyclone-rated configs

Shipping & ports for Australia & New Zealand

The standard trade routes we consolidate to for this market. Transit is the ocean leg only — the door-to-door lead time is the figure in the facts table above.

Melbourne

~18–22 days

Primary AU consolidation; VIC and NSW jobs

Sydney

~20–24 days

Direct and via Melbourne, by freight availability

Brisbane

~20–24 days

Queensland jobs — the cyclone-belt edge

FOB, CIF or DDP with a loading report on every container — 40HQ consolidation across ranges where the schedule allows.

Australia & New Zealand questions

Which wind region applies to my site?+

The region is set per site to AS/NZS 1170.2 — A to D, with C and D the cyclonic ones — and the structural calculation for the configured geometry is issued with the shop drawings rather than assumed from a catalogue.

Is the glazing AS 1288 compliant?+

Window and balustrade glazing is configured to AS 1288, with the GR-100 railing calculation issued per project. The report references the models on the order.

How long to Melbourne?+

About 18–22 days at sea from Foshan, on top of 30–40 days of production on a standard schedule. Brisbane and Sydney run a few days longer depending on the sailing.

The Australia & New Zealand line card

Get the line card

Systems, standards, ports and lead times for this market — plus a contact who has shipped to it before.

Prefer to talk it through?

Send a drawing or a one-line brief on WhatsApp.

+86 177 0868 3991 — quotation within 24 hours, shop drawings free in 3 working days.