The factory
One site, one quality gate. Sashes leave the line factory-assembled and pre-glazed — the tolerance work is done under a roof, not on your job site.


The section, up close
Every system is built on multi-chamber 6063-T5 extrusion with a continuous PA66 thermal-break bar and two replaceable EPDM gasket lines. The values in the performance band on the home page are read off this section — here it is, photographed.



Materials, specified at the line
Every material below is stated on the data sheet per project — the mill certificate for the profile, the schedule for the coating, the specification for the glass. Nothing is “equivalent or better” in the paperwork; the paperwork names the material.
Profile
6063-T5 multi-chamber extrusion, PA66-GF25 thermal-break bar, corner-bonded in the press line. Mill certificate retained per heat.
Surface
Chromate-free pre-treatment, 80–100 µm powder coat with the salt-fog schedule on coastal elevations, anodising or wood-grain film where the specification calls for them.
Glazing
Tempered, laminated or IGU to the project schedule — 0.38 SGP interlayer on impact units, 24–42 mm asymmetric laminated core on the acoustic range.
Hardware & seals
316 stainless on marine schedules, 6–12 point multi-point locks, anti-lift cam on every sash, two replaceable EPDM gasket lines with the replacement cycle published.
Six stages, one gate
- 01
Extrusion & thermal break
- 02
Finishing
- 03
Glazing
- 04
Sash assembly
- 05
Quality gate
- 06
Crating & loading
The quality gate, in numbers
Spot-tested on the rig at stage five, and the tested figure — not the nominal one — is what lands in the data sheet. Configuration targets as published on the home page.
1.4 W/m²K
3,500 Pa
900 Pa
Class 4
45 dB
What every crate documents
The balance of payment runs against a photo report, and the report runs against the same documentation that ships in the crate. Nothing on site should be guessed.
Packing list & loading report
Unit-by-unit, per container, with the crate and pallet map.
Pre-shipment photo report
Every unit photographed at the quality gate before the balance is due.
Hardware & glass schedules
The exact lock set, hinge line and glazing unit per reference — matches the schedule.
Install guide per market
The three-zone fixing detail and sealant schedule for your building code.
Crating
Corner-protected, desiccanted, with a moisture card at the first layer.
What a buyer should verify — and where we show it
The list below is what we would ask of a supplier. Each row names the document we issue against it, so the audit takes a checklist, not a conversation.
“Is the profile the one on the data sheet?”
Mill certificate per heat, attached to the shop drawings.
“Is the coating schedule specified, not assumed?”
Coating data sheet with the salt-fog hours for your elevation, per project.
“Is the glass unit built to the schedule?”
Glazing schedule per reference — thickness, core, SGP, low-E — matched against the quotation.
“Was the rating tested on our sizes?”
Project test report (PGT for impact, EN/AS rig for performance) on the configuration we ship.
“Does the documentation follow the container?”
Packing list, loading report and pre-shipment photo report — the balance runs against them.