
Screen Doors
SC-40 — Fibreglass mesh · rust-proof hardware · sliding or hinged

SC-40
Air and light in, everything else out — the South-East Asian and coastal standard.
Fibreglass mesh · rust-proof hardware · sliding or hinged
- 8
- 6
- 30–40 days
- 10 yr
8
6
30–40 days
10 yr
What the section drawing decides
High-end custom is decided in the section drawing, not the brochure. These four layers are held to specification on every SC-40 unit we ship.
Slim aluminium to match the paired door
316 stainless hardware
Fibreglass or stainless, 16-19 gauge
Specified as a pair, not alone
Technical detail
The section, the hardware and the fixings — photographed, not rendered. This is the level of detail your drawing office specifies against and your site crew installs to, on every unit that leaves the line.
Profile cross-section
Slim aluminium frame sized to sit beside a sliding or french door without a step change in the sight line. It is quoted as a pair with the door it serves.
Slim aluminium, matches paired door
Fibreglass or stainless, 16–19 gauge
Sliding or hinged, to 1,000 × 2,400 mm
Quoted with the door it serves






Hardware
316 stainless hardware, salt-fog rated, because a screen door is the leaf that gets handled with wet hands on a coastal run. A full-height hand-pull is on the hinged leaf.
316 stainless, salt-fog rated
Full-height hand-pull, hinged
16–19 gauge
Cycled as the pair








Installation
Factory-assembled and pre-glazed, so the tolerance work is done under a roof. On site the build is a three-zone detail — air, insulation, weatherproofing — and every crate arrives with the install guide and the sealant schedule for that market.
Factory-assembled
3-zone: air / insulation / water
Per-crate install sheet
Scheduled per market






The system in short
Screen doors are slim framed leaves — sliding or hinged — that keep an opening ventilated against insects and debris. SC-40 runs fibreglass or stainless mesh in 316 salt-fog-rated hardware, matched to the sliding or french range it pairs with, up to 1,000 × 2,400 mm: the standard for South-East Asian and coastal residential.
Sliding and hinged screen doors with fibreglass or stainless mesh and hardware rated for salt air, up to 1,000 × 2,400 mm. Usually specified as a pair with the sliding or french range so the opening stays ventilated through the wet season.
The frame sits on a slim channel beside the paired door leaf, matched in finish and in line. Mesh is sized for the wind case at the site and held taut at all four sides in a removable spline channel — the service kit is packed in with the shipment.


Models and sizes
Every SC-40 ships as one of the configurations below — specify by model code in your window schedule and it quotes line by line.
SC-40 SLIDE
- Sliding screen leaf
- Fibreglass mesh
SC-40 HINGED
- Hinged screen leaf, hand-pull
- Fibreglass or stainless
SC-40 PET
- Pet-flap aperture engineered in
- Stainless mesh
SC-40 MARINE
- Salt-fog schedule, coastal
- Stainless mesh

Specifications
- Fibreglass or stainless, 16–19 gauge options
- Slim aluminium, matches paired door range
- 316 stainless, salt-fog rated
- Sliding or hinged, up to 1,000 × 2,400 mm
- Full-height hand-pull on hinged leaf
- Specified with sliding or french doors

Material & craft
The layers held to specification on every SC-40 unit — the section drawing above, written out.

Mesh
Fibreglass or stainless 16–19 gauge, tensioned flat in a removable spline channel — the service kit is packed in the crate.

Frame
A slim frame matched to the paired range — sliding with the SD-50 track logic, hinged with the FD-60 handing — up to 1,000 × 2,400 mm.

Coastal schedule
The SC-40 MARINE variant runs 316 stainless hardware through the salt-fog rating, on the same frame line.
What it's worth to you

The opening stays open through the wet season — air in, everything else out; that is the whole point of the screen.
Paired doors quote as one line: the screen follows the slider, the hinged leaf matches the door handing.
A 10-year warranty on the mesh frame, with the replacement spline and mesh listed as a service part.
Specify Screen Doors
Send the project location, the opening sizes and the finish. Drawings, window schedules or a specification can be attached — quoting is done against the drawings, not a price list.
Where it is specified
The sites we build this system for, and what the schedule changes in each one.
Tropical villas
The opening stays open through the wet season — air in, everything else out.
Paired with SD-50 sliding
Same track logic, screen follows the slider.
Paired with FD-60 french
The hinged leaf matches the door handing.
Coastal specifications
SC-40 MARINE takes the salt-fog hardware schedule.
Hospitality patios
Mesh rated for daily operation in restaurant frontages.
Options and finishes
Finish
Anodised Natural
Anodised Silver
Anthracite · RAL 7016
Graphite · RAL 7024
Jet Black · RAL 9005
Traffic White · RAL 9016
Cream · RAL 1015
Champagne · RAL 1019
Ash Natural
Walnut Dark
Bronze
Copper
Design features
Fibreglass or stainless mesh, 16–19 gauge
Slim frame matched to the paired door range
316 stainless hardware, salt-fog rated
Sliding or hinged, to 1,000 × 2,400 mm
Full-height hand-pull on the hinged leaf
Removable spline channel — service kit packed in
Glass build
Two choices set what the glass does in a SC-40: which coating is on it, and what fills the cavity. The coating sets the solar figure. The gas moves the U-value and leaves the solar figure where it was — which is why the two are decided separately. The values below are published by the glass manufacturers for the build named; they are centre-of-glass figures, and the whole-window value for a configuration is read from the report that covers it.
| Build | SHGC | U, centre of glass | Where it is chosen |
|---|---|---|---|
| LoE-180, argon | 0.69 | 0.26 | High solar gain, cold climate |
| LoE-272, argon | 0.41 | 0.25 | Balanced, the usual default |
| LoE-366, argon | 0.27 | 0.24 | Solar control, west and south glass |
| LoE-366 with LoE-i89 on #4, argon | 0.27 | 0.20 | Solar control with the lowest U-value |
NFRC centre-of-glass values for a 3/4 in two-pane unit with 3 mm lites and a 13 mm argon cavity. The spacer is the third lever and behaves differently again: it works at the edge of the unit, so it shows in the whole-window value rather than here.
Full glass performance tables, including air against argon and EN 673 values →
Buying & delivery
The commercial terms behind the SC-40 — minimum order, quotation, payment, packing and warranty — are the same on every quotation and sit on the commercial terms for screens ordered with the door. Buying to resell, or to fabricate the line yourself? supplying screens with the window order covers the supplier view of the same schedule.
Request a quote for this system- 30–40 days from approved shop drawings. Assembly, glazing and quality control sit inside the quoted lead time, not on top of it.
- The mesh and hardware are specified to the corrosion class of the site, and the 316 stainless line is the salt-air specification. The frame matches the paired door range, so the assembly carries that range standard for the destination market; no separate product standard is claimed for the mesh.
- The mesh, track and hardware schedules ship with the paired door package. The service kit, replacement spline and mesh, is packed in with the shipment. Test reports are issued on request.
Documentation
Data sheet
Brochure
CAD sections & BIM families
Specification clauses
RFQ template
Confirm before the order is placed
Six items hold up an order on the SC-40 more often than anything else. None of them is decided here; each one has to be settled on the project side before the drawing set is frozen.
Rough opening, not frame size
Confirm the structural opening and the reveal build-up. The frame is ordered to the approved drawing, and the drawing is what the quotation is built from.
The opening is quoted before the render and the closing detail, then the reveal takes back the clearance.
Glass build
Confirm pane thickness, coating, spacer and cavity gas as one line. The tested configuration is the one the report covers.
Glass specified by thickness alone. The coating, spacer and gas move the U-value and the SHGC independently.
Operation and handing
Confirm the opening direction, the handing and the number of leaves, and say which side the handing is read from.
Handing recorded from the inside on one schedule and the outside on another.
Finish
Confirm the RAL or anodising grade, and whether the address needs a marine-grade schedule.
The finish is picked from a screen, and the coastal requirement is raised after production has started.
Hardware
Confirm handle type, locking point count, and whether the market requires key-operated locking.
Hardware assumed standard; the site then needs keyed-alike cylinders that were never on the order.
Documents with the shipment
Confirm which reports and declarations travel with the crate. A certificate is issued per configuration, not per product family.
Test documentation requested after shipment, when the report for that configuration has to be re-issued.
Threshold and floor build-up
Confirm the finished floor level and whether a flush, barrier-free threshold is required.
The threshold is decided on site, after the frame has been extruded to a standard sill.
Who confirms each part
No single party holds the whole decision. The drawing set is the one place they meet.
Buyer or developer
Opens the order: the standard the project has to meet, and the market it ships to.
Designer or architect
Sets the configuration: sizes, operation, finish and the glass build.
Structural engineer
Where the market requires it, sets the wind load the opening is rated to.
Factory
Confirms what can be built to that drawing, and issues the report for the configuration.
Everything else on the commercial side — minimum order, quotation, payment, packing and warranty — is the same on every order and sits on the commercial terms page.
Compare with the other door systems
Every system in this category on one table — the platform it shares, the opening it carries and the glazing it takes. Figures come from each system record, not retyped here.
| Code | System | Platform | Glazing options |
|---|---|---|---|
| LS-60 | Lift & Slide Doors | 10–16 mm tempered or laminated | |
| BF-40 | Bi-Fold Doors | 8–16 mm tempered | |
| SD-50 | Sliding Patio Doors | 8–20 mm tempered or IGU | |
| FD-60 | French Doors | 8–19 mm tempered or IGU | |
| PV-75 | Pivot Doors | 19–25 mm laminated or IGU | |
| SC-40 | Screen Doors | No glazing — mesh screen door | |
| ED-90 | Entry Doors | No glazing — laminated core leaf |
Screen Doors installed

Frequently asked
Yes — the screen sits in a removable spline channel; service kits are packed with the shipment.
Other systems on the same platform
All systems



Specify SC-40 for your project
The Fibreglass mesh configuration is quoted unit by unit, within 24 hours.