

ED-90
The first thing a visitor tests, and the last thing a façade forgets.
Inward entry · 105 mm leaf · key on both sides
- 9
- 6
- 30–40 days
- 15 yr
9
6
30–40 days
15 yr
What the section drawing decides
High-end custom is decided in the section drawing, not the brochure. These four layers are held to specification on every ED-90 unit we ship.
105 mm leaf, 31 mm visible face
Key-operated both sides
Laminated core, panel or sidelight
EN 14351-1, EN 13830, AAMA 2605 option
Technical detail
The section, the hardware and the fixings — photographed, not rendered. This is the level of detail your drawing office specifies against and your site crew installs to, on every unit that leaves the line.
Profile cross-section
Entry leaf at 105 mm and 1.8 mm wall, thermal-break. The 31 mm visible face is what the entrance elevation actually reads, which is why the face width is quoted separately from the leaf depth.
105 mm thermal-break, 1.8 mm wall
31 mm
Laminated
Flat, fluted or woodgrain






Hardware
Multi-point locking with a long-pull handle in anodised RAL, key-operated on both sides. The pull is on the leaf rather than on a separate stile.
Multi-point, key both sides
Long-pull, anodised RAL
To triple 5+18A+5+15A+5
Cycled with the core fitted








Installation
Factory-assembled and pre-glazed, so the tolerance work is done under a roof. On site the build is a three-zone detail — air, insulation, weatherproofing — and every crate arrives with the install guide and the sealant schedule for that market.
Factory-assembled
3-zone: air / insulation / water
Per-crate install sheet
Scheduled per market






The system in short
An entry door is the primary access leaf of a building — an inward-opening, multi-point-locked aluminium door with a laminated core and a key from both sides. ED-90 builds it on a 105 mm thermal-break leaf with a 31 mm visible face, flat, fluted or woodgrain panels, and a fluted or clear sidelight to a triple 5+18A+5+15A+5 unit, for residential and boutique-hotel entries.
An inward entry door on a 105 mm thermal-break leaf with a 31 mm visible face, a laminated core and a multi-point lock keyed on both sides. Flat, fluted or woodgrain panels over the core, a fluted or clear sidelight beside the leaf, and a long-pull handle in anodised RAL.
The lock schedule is the entry specification: multi-point engagement across the meeting edge, a key from either face, and the laminated core behind the panel line. The sidelight or vision panel takes glazing up to a triple 5+18A+5+15A+5 unit, and the leaf arrives factory-assembled with the lock set fitted and function-checked before crating.


Models and sizes
Every ED-90 ships as one of the configurations below — specify by model code in your window schedule and it quotes line by line.
ED-90 PANEL
- Solid leaf, flat or fluted panels
- Laminated core, no glazing
ED-90 VISION
- Leaf with vision panel
- Tempered laminated
ED-90 SIDELIGHT
- Leaf plus fluted or clear sidelight
- To triple 5+18A+5+15A+5
ED-90 KEY
- Key on both faces, entrance schedule
- Laminated core

Specifications
- 105 mm thermal-break, 1.8 mm wall, 31 mm visible face
- Multi-point, key-operated on both sides
- Laminated core; flat, fluted or woodgrain panels
- Fluted or clear, glazing to triple 5+18A+5+15A+5
- Long-pull, anodised RAL
- Tested to EN 14351-1, EN 13830; AAMA 2605 finish option

Material & craft
The layers held to specification on every ED-90 unit — the section drawing above, written out.

Leaf build
A 105 mm thermal-break leaf on a 1.8 mm wall with a 31 mm visible face — the panel line hides the depth, and the depth does the sealing.

Lock schedule
Multi-point engagement across the meeting edge with a key on both faces; the laminated core sits behind the panel line, and the turn of the key is the security position.

Finish & handle
Flat, fluted or woodgrain panels over the laminated core, the long-pull handle in anodised RAL, and a fluted or clear sidelight that takes the triple unit.
What it's worth to you

The key works on both faces — the street-facing side and the approach side quote as one leaf, not two doors.
Factory-assembled with the lock set fitted and function-checked before crating: the site hangs, fixes and levels.
A 15-year warranty on the frame and the hardware, counted from the loading report that ships in the crate.
Specify Entry Doors
Send the project location, the opening sizes and the finish. Drawings, window schedules or a specification can be attached — quoting is done against the drawings, not a price list.
Where it is specified
The sites we build this system for, and what the schedule changes in each one.
Residential entries
The street-facing leaf with the key on both faces.
Boutique hotel arrivals
A solid or vision leaf that quotes as one line per unit.
Townhouse frontages
The 31 mm visible face for the compressed entry bay.
Garden and side entries
The vision-panel model where the entry takes the light.
Shared-approach buildings
Two keyed faces for the double-front specification.
Options and finishes
Finish
Anodised Natural
Anodised Silver
Anthracite · RAL 7016
Graphite · RAL 7024
Jet Black · RAL 9005
Traffic White · RAL 9016
Cream · RAL 1015
Champagne · RAL 1019
Ash Natural
Walnut Dark
Bronze
Copper
Design features
105 mm leaf, 1.8 mm wall, 31 mm visible face
Multi-point lock, key-operated on both sides
Laminated core; flat, fluted or woodgrain panels
Fluted or clear sidelight to triple 5+18A+5+15A+5
Long-pull handle, anodised RAL
Factory-assembled, lock set function-checked
Glass build
Two choices set what the glass does in a ED-90: which coating is on it, and what fills the cavity. The coating sets the solar figure. The gas moves the U-value and leaves the solar figure where it was — which is why the two are decided separately. The values below are published by the glass manufacturers for the build named; they are centre-of-glass figures, and the whole-window value for a configuration is read from the report that covers it.
| Build | SHGC | U, centre of glass | Where it is chosen |
|---|---|---|---|
| LoE-180, argon | 0.69 | 0.26 | High solar gain, cold climate |
| LoE-272, argon | 0.41 | 0.25 | Balanced, the usual default |
| LoE-366, argon | 0.27 | 0.24 | Solar control, west and south glass |
| LoE-366 with LoE-i89 on #4, argon | 0.27 | 0.20 | Solar control with the lowest U-value |
NFRC centre-of-glass values for a 3/4 in two-pane unit with 3 mm lites and a 13 mm argon cavity. The spacer is the third lever and behaves differently again: it works at the edge of the unit, so it shows in the whole-window value rather than here.
Full glass performance tables, including air against argon and EN 673 values →
Buying & delivery
The commercial terms behind the ED-90 — minimum order, quotation, payment, packing and warranty — are the same on every quotation and sit on the commercial terms including hardware and gasket warranty. Buying to resell, or to fabricate the line yourself? how an entrance order is supplied covers the supplier view of the same schedule.
Request a quote for this system- 30–40 days from approved shop drawings. Assembly, glazing and quality control sit inside the quoted lead time, not on top of it.
- Tested to EN 14351-1 and EN 13830, with an AAMA 2605 finish option. Door and sidelight glazing is safety material to SANS 10400-N:2012 and SANS 1263-1; the leaf and locking line are scheduled to SANS 1263-2, and the assembly answers SANS 613.Source documents: EN 14351-1·AAMA 2604 / 2605·SANS 10400-N·SANS 1263-1·SANS 1263-2·SANS 613
- The leaf, lock and glass schedules ship in the shop drawing package, free, within three working days of approved architectural drawings. The lock set is fitted and function-checked before crating. Test reports are issued on request.
Documentation
Data sheet
Brochure
CAD sections & BIM families
Specification clauses
RFQ template
Confirm before the order is placed
Six items hold up an order on the ED-90 more often than anything else. None of them is decided here; each one has to be settled on the project side before the drawing set is frozen.
Rough opening, not frame size
Confirm the structural opening and the reveal build-up. The frame is ordered to the approved drawing, and the drawing is what the quotation is built from.
The opening is quoted before the render and the closing detail, then the reveal takes back the clearance.
Glass build
Confirm pane thickness, coating, spacer and cavity gas as one line. The tested configuration is the one the report covers.
Glass specified by thickness alone. The coating, spacer and gas move the U-value and the SHGC independently.
Operation and handing
Confirm the opening direction, the handing and the number of leaves, and say which side the handing is read from.
Handing recorded from the inside on one schedule and the outside on another.
Finish
Confirm the RAL or anodising grade, and whether the address needs a marine-grade schedule.
The finish is picked from a screen, and the coastal requirement is raised after production has started.
Hardware
Confirm handle type, locking point count, and whether the market requires key-operated locking.
Hardware assumed standard; the site then needs keyed-alike cylinders that were never on the order.
Documents with the shipment
Confirm which reports and declarations travel with the crate. A certificate is issued per configuration, not per product family.
Test documentation requested after shipment, when the report for that configuration has to be re-issued.
Threshold and floor build-up
Confirm the finished floor level and whether a flush, barrier-free threshold is required.
The threshold is decided on site, after the frame has been extruded to a standard sill.
Who confirms each part
No single party holds the whole decision. The drawing set is the one place they meet.
Buyer or developer
Opens the order: the standard the project has to meet, and the market it ships to.
Designer or architect
Sets the configuration: sizes, operation, finish and the glass build.
Structural engineer
Where the market requires it, sets the wind load the opening is rated to.
Factory
Confirms what can be built to that drawing, and issues the report for the configuration.
Everything else on the commercial side — minimum order, quotation, payment, packing and warranty — is the same on every order and sits on the commercial terms page.
Compare with the other door systems
Every system in this category on one table — the platform it shares, the opening it carries and the glazing it takes. Figures come from each system record, not retyped here.
| Code | System | Platform | Glazing options |
|---|---|---|---|
| LS-60 | Lift & Slide Doors | 10–16 mm tempered or laminated | |
| BF-40 | Bi-Fold Doors | 8–16 mm tempered | |
| SD-50 | Sliding Patio Doors | 8–20 mm tempered or IGU | |
| FD-60 | French Doors | 8–19 mm tempered or IGU | |
| PV-75 | Pivot Doors | 19–25 mm laminated or IGU | |
| SC-40 | Screen Doors | No glazing — mesh screen door | |
| ED-90 | Entry Doors | No glazing — laminated core leaf |
Read before you specify
- Security glazing in South Africa — what a door has to resist
- 6063 vs 6061: which alloy the door section is extruded from
- EN 14351 and the DoP on an entrance door — what the declaration covers
- Inland or coastal entrance doors: the finish and hardware call
- Sourcing an entrance door for the US market: the listing path
- Entrance or pivot: the leaf size that decides the door
Entry Doors installed

Frequently asked
Yes — the multi-point lock takes a key on both faces, the standard for street-facing and shared-approach entries.
Other systems on the same platform
All systems



Specify ED-90 for your project
The Inward entry configuration is quoted unit by unit, within 24 hours.