
Glass Railings
GR-100 — Tempered laminated · post-free · floor or wall channel

GR-100
The view should not have to go through a post.
Tempered laminated · post-free · floor or wall channel
- 8
- 6
- 30–40 days
- 15 yr
8
6
30–40 days
15 yr
What the section drawing decides
High-end custom is decided in the section drawing, not the brochure. These four layers are held to specification on every GR-100 unit we ship.
Post-free by design
Channel type decides the detail
12-19 mm tempered laminated
AS 1288 and EN 14449 glass
Technical detail
The section, the hardware and the fixings — photographed, not rendered. This is the level of detail your drawing office specifies against and your site crew installs to, on every unit that leaves the line.
Profile cross-section
Post-free by design: the load runs into a floor channel or a wall channel, which is what lets the view run past the handrail line. A floor channel serves a balcony edge, a wall channel where the glass returns to structure.
12–19 mm tempered laminated
Floor channel or wall channel
None
Up to 1,800 × 1,100 mm






Hardware
Handrail is none, an aluminium profile or a timber cap — chosen for the sightline rather than for the connection. Edge is polished, bevelled or a mechanical channel.
None / aluminium profile / timber cap
Polished, bevel or channel
Option where the view is the point
Structural adequacy per project








Installation
Factory-assembled and pre-glazed, so the tolerance work is done under a roof. On site the build is a three-zone detail — air, insulation, weatherproofing — and every crate arrives with the install guide and the sealant schedule for that market.
Factory-assembled
3-zone: air / insulation / water
Per-crate install sheet
Scheduled per market






The system in short
A glass railing is a balustrade of tempered laminated glass panels fixed in floor or wall channels with no intermediate posts, so the view runs unbroken. GR-100 runs 12–19 mm units up to 1,800 mm wide and 1,100 mm high, low-iron available, configured to AS 1288 / EN 14449 for staircases, balconies and pool edges.
Post-free glass railing in 12–19 mm tempered laminated units, fixed in floor or wall channels, panels up to 1,800 mm wide and 1,100 mm high. Specified with staircases, balconies and pool edges across the residential range, low-iron glass available where the tint of standard float shows.
Panels are produced on the same glass line as the window range, with the edge treatment — polished, bevel or mechanical channel — fixed at drawing stage. Curved units take a radius that the staircase geometry sets, on the same production line.


Models and sizes
Every GR-100 ships as one of the configurations below — specify by model code in your window schedule and it quotes line by line.
GR-100 FLOOR
- Floor-channel fixing
- 15–19 mm laminated
GR-100 WALL
- Wall-channel fixing
- 12–15 mm laminated
GR-100 CURVED
- Curved panel, radius at drawing
- Laminated, heat-strengthened
GR-100 POOL
- Pool edge specification
- 19 mm low-iron laminated

Specifications
- 12–19 mm tempered laminated, low-iron option
- Floor channel or wall channel, post-free
- None, aluminium profile or timber cap
- Up to 1,800 mm wide, 1,100 mm high
- Polished, bevel or mechanical channel
- AS 1288 / EN 14449 glass, structural per project

Material & craft
The layers held to specification on every GR-100 unit — the section drawing above, written out.

Glass unit
12–19 mm tempered laminated, low-iron available, panels to 1,800 mm wide and 1,100 mm high, on the AS 1288 / EN 14449 configuration.

Fixing
Floor channel or wall channel, post-free — polished, bevel or mechanical channel edge, with an optional aluminium profile or timber cap.

Curved line
Curved units run on the same production line; the radius comes from the drawing, not from a catalogued bend.
What it's worth to you

The view runs unbroken through the whole flight — no post in sight on stairs, balconies or pool edges.
The pool edge takes the 19 mm low-iron schedule on the same 15-year warranty as the window range.
Post-free fixing keeps the balcony face clean and the installation sheet short — channel, glass, one line per bay.
Specify Glass Railings
Send the project location, the opening sizes and the finish. Drawings, window schedules or a specification can be attached — quoting is done against the drawings, not a price list.
Where it is specified
The sites we build this system for, and what the schedule changes in each one.
Staircases
The view runs through the whole flight, no post in sight.
Balconies
Floor-channel fixing keeps the balcony face clean.
Pool edges
GR-100 POOL takes the 19 mm low-iron schedule.
Loft and mezzanine landings
Light passes through the railing into the lower room.
Glass-house extensions
The railing joins the fixed glazing on one visual line.
Options and finishes
Finish
Anodised Natural
Anodised Silver
Anthracite · RAL 7016
Graphite · RAL 7024
Jet Black · RAL 9005
Traffic White · RAL 9016
Cream · RAL 1015
Champagne · RAL 1019
Ash Natural
Walnut Dark
Bronze
Copper
Design features
12–19 mm tempered laminated, low-iron option
Floor channel or wall channel, post-free
Panels to 1,800 mm wide, 1,100 mm high
Polished, bevel or mechanical channel edge
Optional aluminium profile or timber cap
Curved units on the same production line
Glass build
Two choices set what the glass does in a GR-100: which coating is on it, and what fills the cavity. The coating sets the solar figure. The gas moves the U-value and leaves the solar figure where it was — which is why the two are decided separately. The values below are published by the glass manufacturers for the build named; they are centre-of-glass figures, and the whole-window value for a configuration is read from the report that covers it.
| Build | SHGC | U, centre of glass | Where it is chosen |
|---|---|---|---|
| LoE-180, argon | 0.69 | 0.26 | High solar gain, cold climate |
| LoE-272, argon | 0.41 | 0.25 | Balanced, the usual default |
| LoE-366, argon | 0.27 | 0.24 | Solar control, west and south glass |
| LoE-366 with LoE-i89 on #4, argon | 0.27 | 0.20 | Solar control with the lowest U-value |
NFRC centre-of-glass values for a 3/4 in two-pane unit with 3 mm lites and a 13 mm argon cavity. The spacer is the third lever and behaves differently again: it works at the edge of the unit, so it shows in the whole-window value rather than here.
Full glass performance tables, including air against argon and EN 673 values →
Buying & delivery
The commercial terms behind the GR-100 — minimum order, quotation, payment, packing and warranty — are the same on every quotation and sit on the commercial terms for balustrade glass. Buying to resell, or to fabricate the line yourself? how balustrade glass is supplied covers the supplier view of the same schedule.
Request a quote for this system- 30–40 days from approved shop drawings. Assembly, glazing and quality control sit inside the quoted lead time, not on top of it.
- Glass configured to AS 1288 and EN 14449, with the structural calculation issued per project. Balustrade impact and line loads follow SANS 10160-2, and the glazing assembly answers SANS 613. A toughened pane is the default unless the drawing supports the panel on all four sides; the report is issued against the configured panel.Source documents: AS 1288:2015·SANS 10160-2·SANS 613
- The structural calculation, the channel setting-out and the panel schedule ship in the shop drawing package. Panels are crated vertically on edge, not flat. Test reports are issued on request.
Documentation
Data sheet
Brochure
CAD sections & BIM families
Specification clauses
RFQ template
Confirm before the order is placed
Six items hold up an order on the GR-100 more often than anything else. None of them is decided here; each one has to be settled on the project side before the drawing set is frozen.
Rough opening, not frame size
Confirm the structural opening and the reveal build-up. The frame is ordered to the approved drawing, and the drawing is what the quotation is built from.
The opening is quoted before the render and the closing detail, then the reveal takes back the clearance.
Glass build
Confirm pane thickness, coating, spacer and cavity gas as one line. The tested configuration is the one the report covers.
Glass specified by thickness alone. The coating, spacer and gas move the U-value and the SHGC independently.
Operation and handing
Confirm the opening direction, the handing and the number of leaves, and say which side the handing is read from.
Handing recorded from the inside on one schedule and the outside on another.
Finish
Confirm the RAL or anodising grade, and whether the address needs a marine-grade schedule.
The finish is picked from a screen, and the coastal requirement is raised after production has started.
Hardware
Confirm handle type, locking point count, and whether the market requires key-operated locking.
Hardware assumed standard; the site then needs keyed-alike cylinders that were never on the order.
Documents with the shipment
Confirm which reports and declarations travel with the crate. A certificate is issued per configuration, not per product family.
Test documentation requested after shipment, when the report for that configuration has to be re-issued.
Drainage and roof load
Confirm the drainage path and the load the supporting structure carries.
The roof load is assumed by the frame supplier and by the builder on opposite assumptions.
Who confirms each part
No single party holds the whole decision. The drawing set is the one place they meet.
Buyer or developer
Opens the order: the standard the project has to meet, and the market it ships to.
Designer or architect
Sets the configuration: sizes, operation, finish and the glass build.
Structural engineer
Where the market requires it, sets the wind load the opening is rated to.
Factory
Confirms what can be built to that drawing, and issues the report for the configuration.
Everything else on the commercial side — minimum order, quotation, payment, packing and warranty — is the same on every order and sits on the commercial terms page.
Compare with the other glass space systems
Every system in this category on one table — the platform it shares, the opening it carries and the glazing it takes. Figures come from each system record, not retyped here.
| Code | System | Platform | Glazing options |
|---|---|---|---|
| SR-200 | Sunrooms | Fixed glass or polycarbonate | |
| LP-120 | Louvered Pergolas | No glazing — louvered roof | |
| GR-100 | Glass Railings | 15–19 mm laminated | |
| SK-60 | Skylights | Tempered low-E IGU |
Glass Railings installed

Frequently asked
For balustrade duty yes — laminated keeps the glass in place after impact, which is what the code asks for.
Other systems on the same platform
All systems


Specify GR-100 for your project
The Tempered laminated configuration is quoted unit by unit, within 24 hours.