

SR-200
A room under the sky — glass roof, aluminium frame, all seasons.
Aluminium frame · glass roof · up to 7 m span
- 12
- 10
- 40–50 days
- 15 yr
12
10
40–50 days
15 yr
What the section drawing decides
High-end custom is decided in the section drawing, not the brochure. These four layers are held to specification on every SR-200 unit we ship.
Structural thermal-break frame
Roof drives the geometry
Glass or polycarbonate roof
Configured to local structural code
Technical detail
The section, the hardware and the fixings — photographed, not rendered. This is the level of detail your drawing office specifies against and your site crew installs to, on every unit that leaves the line.
Profile cross-section
Structural thermal-break frame rather than a decorative one, because the roof span carries into it. Clear span reaches 7 m.
Structural thermal-break aluminium
Up to 7 m
Gable, flat or curved roof
Concealed gutter, downpipe routed






Hardware
Roof options are fixed, motorised louvered, or mixed — ventilation without adding a second opening system to the elevation.
Fixed / motorised louvered / mixed
Without a second system
Carries the roof span
Span checked per project








Installation
Factory-assembled and pre-glazed, so the tolerance work is done under a roof. On site the build is a three-zone detail — air, insulation, weatherproofing — and every crate arrives with the install guide and the sealant schedule for that market.
Factory-assembled
3-zone: air / insulation / water
Per-crate install sheet
Scheduled per market






The system in short
A sunroom is a glazed room added to a house that lives in all four seasons: structural aluminium frame, glass or polycarbonate roof panels, concealed drainage. SR-200 spans up to 7 m clear in gable, flat or curved geometry, with fixed, motorized-louver or mixed roof schedules for hot-climate ventilation, plus track channels for blinds or shades fitted later.
Structural aluminium sunroom frames with glass or polycarbonate roof panels, up to a 7 m clear span with no intermediate column in the room. Configured as a gable, flat or curved roof with integrated drainage, and with fixed, louvered or mixed roof schedules for the climate the site is in.
The roof is configured per site: fixed glass for the light case, louvered sections where the climate wants active ventilation, and the mixed schedule that does both. Drainage runs concealed, with downpipe routing in the drawings, and track channels for blinds or shades are built in so shading can come later without new structure.


Models and sizes
Every SR-200 ships as one of the configurations below — specify by model code in your window schedule and it quotes line by line.
SR-200 GABLE
- Gable roof, to 7 m span
- Fixed glass or polycarbonate
SR-200 FLAT
- Flat roof, 5° min pitch
- Fixed IGU panels
SR-200 CURVED
- Curved roof profile
- Laminated curved glass
SR-200 LOUVER
- Motorized louver roof section
- Louver + fixed mix

Specifications
- Structural thermal-break aluminium
- Glass or polycarbonate, up to 7 m clear span
- Gable, flat or curved roof profiles
- Concealed gutter, downpipe routing included
- Fixed, louvered (motorized) or mixed
- Configured to local structural code per project

Material & craft
The layers held to specification on every SR-200 unit — the section drawing above, written out.

Structure
A structural thermal-break aluminium frame carrying the roof load — gable, flat (5° minimum pitch) or curved — spanning up to 7 m clear.

Roof schedules
Glass or polycarbonate, fixed, motorized-louver or mixed; the concealed gutter with downpipe routing is included in the frame.

Glazing & shading
Low-E or tinted roof glazing for the summer case; track channels for blinds or shades are fitted at the line, not after.
What it's worth to you

A full room under glass that lives in all four seasons — the structure is what makes the roof load honest.
The louver section vents heat before it accumulates: the hot-climate veranda case, on the same marine schedule as the window range.
A 15-year frame warranty with the shop-drawing package the structural engineer signs — issued free within three working days of approval.
Specify Sunrooms
Send the project location, the opening sizes and the finish. Drawings, window schedules or a specification can be attached — quoting is done against the drawings, not a price list.
Where it is specified
The sites we build this system for, and what the schedule changes in each one.
Garden rooms
A full room under glass — the structure carries the roof load.
Hot-climate verandas
The louver section vents heat before it accumulates in the room.
Kitchen extensions
All-day light where the site blocks the west sun.
Coastal conservatories
The same salt-fog schedule as the window range applies to the frame.
Four-season use
Low-E or tinted roof glazing keeps the summer case in hand.
Options and finishes
Finish
Anodised Natural
Anodised Silver
Anthracite · RAL 7016
Graphite · RAL 7024
Jet Black · RAL 9005
Traffic White · RAL 9016
Cream · RAL 1015
Champagne · RAL 1019
Ash Natural
Walnut Dark
Bronze
Copper
Design features
Structural thermal-break aluminium frame
Glass or polycarbonate roof to 7 m clear span
Gable, flat or curved roof profiles
Concealed gutter, downpipe routing included
Fixed, motorized-louver or mixed roof
Track channels for retrofitted shading
Glass build
Two choices set what the glass does in a SR-200: which coating is on it, and what fills the cavity. The coating sets the solar figure. The gas moves the U-value and leaves the solar figure where it was — which is why the two are decided separately. The values below are published by the glass manufacturers for the build named; they are centre-of-glass figures, and the whole-window value for a configuration is read from the report that covers it.
| Build | SHGC | U, centre of glass | Where it is chosen |
|---|---|---|---|
| LoE-180, argon | 0.69 | 0.26 | High solar gain, cold climate |
| LoE-272, argon | 0.41 | 0.25 | Balanced, the usual default |
| LoE-366, argon | 0.27 | 0.24 | Solar control, west and south glass |
| LoE-366 with LoE-i89 on #4, argon | 0.27 | 0.20 | Solar control with the lowest U-value |
NFRC centre-of-glass values for a 3/4 in two-pane unit with 3 mm lites and a 13 mm argon cavity. The spacer is the third lever and behaves differently again: it works at the edge of the unit, so it shows in the whole-window value rather than here.
Full glass performance tables, including air against argon and EN 673 values →
Buying & delivery
The commercial terms behind the SR-200 — minimum order, quotation, payment, packing and warranty — are the same on every quotation and sit on the commercial terms for a glazed room. Buying to resell, or to fabricate the line yourself? how a glazed room is supplied covers the supplier view of the same schedule.
Request a quote for this system- 40–50 days from approved shop drawings. Assembly, glazing and quality control sit inside the quoted lead time, not on top of it.
- Configured to the local structural code at design stage. Roof glazing is safety material to SANS 10400-N:2012, the energy line sits in SANS 10400-XA:2021 Edition 2, and the structural calculation is issued per project against the configured span.Source documents: SANS 10400-N·SANS 10400-XA
- The structural calculation, the glazing support schedule and the drainage setting-out ship in the shop drawing package. Crating follows the section order, corner-protected with desiccant. Test reports are issued on request.
Documentation
Data sheet
Brochure
CAD sections & BIM families
Specification clauses
RFQ template
Confirm before the order is placed
Six items hold up an order on the SR-200 more often than anything else. None of them is decided here; each one has to be settled on the project side before the drawing set is frozen.
Rough opening, not frame size
Confirm the structural opening and the reveal build-up. The frame is ordered to the approved drawing, and the drawing is what the quotation is built from.
The opening is quoted before the render and the closing detail, then the reveal takes back the clearance.
Glass build
Confirm pane thickness, coating, spacer and cavity gas as one line. The tested configuration is the one the report covers.
Glass specified by thickness alone. The coating, spacer and gas move the U-value and the SHGC independently.
Operation and handing
Confirm the opening direction, the handing and the number of leaves, and say which side the handing is read from.
Handing recorded from the inside on one schedule and the outside on another.
Finish
Confirm the RAL or anodising grade, and whether the address needs a marine-grade schedule.
The finish is picked from a screen, and the coastal requirement is raised after production has started.
Hardware
Confirm handle type, locking point count, and whether the market requires key-operated locking.
Hardware assumed standard; the site then needs keyed-alike cylinders that were never on the order.
Documents with the shipment
Confirm which reports and declarations travel with the crate. A certificate is issued per configuration, not per product family.
Test documentation requested after shipment, when the report for that configuration has to be re-issued.
Drainage and roof load
Confirm the drainage path and the load the supporting structure carries.
The roof load is assumed by the frame supplier and by the builder on opposite assumptions.
Who confirms each part
No single party holds the whole decision. The drawing set is the one place they meet.
Buyer or developer
Opens the order: the standard the project has to meet, and the market it ships to.
Designer or architect
Sets the configuration: sizes, operation, finish and the glass build.
Structural engineer
Where the market requires it, sets the wind load the opening is rated to.
Factory
Confirms what can be built to that drawing, and issues the report for the configuration.
Everything else on the commercial side — minimum order, quotation, payment, packing and warranty — is the same on every order and sits on the commercial terms page.
Compare with the other glass space systems
Every system in this category on one table — the platform it shares, the opening it carries and the glazing it takes. Figures come from each system record, not retyped here.
| Code | System | Platform | Glazing options |
|---|---|---|---|
| SR-200 | Sunrooms | Fixed glass or polycarbonate | |
| LP-120 | Louvered Pergolas | No glazing — louvered roof | |
| GR-100 | Glass Railings | 15–19 mm laminated | |
| SK-60 | Skylights | Tempered low-E IGU |
Sunrooms installed

Frequently asked
Roof glazing is specified with a low-E or tinted schedule, and the louvered option vents heat before it accumulates.
Other systems on the same platform
All systems


Specify SR-200 for your project
The Aluminium frame configuration is quoted unit by unit, within 24 hours.