
Marina Holiday Villas
- Marina Holiday Villas
- Southern Italy
- Italy
- Holiday Villas
- ED-90 entrance doors with matching CW-60 casement schedules across a terraced coastal complex
- 2025
- ED-90 · CW-60
- White render · powder-coated blue
- Low-E IGU, solar control

01 / 02
A terraced holiday complex on the southern Italian coast: ED-90 entrance doors are paired with matching CW-60 casement schedules under deep shade canopies, so each unit frames the sea without turning the interior into a greenhouse. Shade and rain protection are drawn as part of the opening package rather than added afterwards.
Materials & finishes
ED-90 · CW-60 — White render · powder-coated blue — Low-E IGU, solar control
Products on this project
The brief
A holiday villas in Southern Italy, Italy — ED-90 entrance doors with matching CW-60 casement schedules across a terraced coastal complex. Frames finished white render · powder-coated blue, glazed with low-e igu, solar control, delivered in 2025. The scope and the frame line were fixed on one numbered window schedule before anything was cut.
The schedule pairs Entry Doors with Casement Windows — different openings, one thermal-break platform, so the façade keeps a single frame line from the street.
The schedule, system by system
What each line of the schedule had to carry, with the tested figures that ship with the order — read straight from the system records, not retyped for this page.
Entry Doors
The first thing a visitor tests, and the last thing a façade forgets.
- 105 mm thermal-break, 1.8 mm wall, 31 mm visible face
- Multi-point, key-operated on both sides
- Laminated core; flat, fluted or woodgrain panels
Casement Windows
The workhorse of every specification — hinge-side airflow, gasket-side airtightness.
- 70 mm thermal-break aluminium
- Up to 1,200 × 1,800 mm
- Class 4 (EN 1026) gasketed
Market, standards & delivery
Local standards
Configured to the standard of Italy, with the report referenced to the models on the order rather than a standing certificate.
Shipping
Crated, desiccanted and documented, shipped FOB, CIF or DDP with a loading report per container.
Documentation
Quotation within 24 hours, free shop drawings in 3 working days, a packing list per crate keyed to the drawing sheet, and the pre-shipment photo report as the baseline before the balance falls due.
Document library →Project questions
What was supplied on this project?
ED-90 entrance doors with matching CW-60 casement schedules across a terraced coastal complex, finished white render · powder-coated blue, glazed with low-e igu, solar control. The document pack for the order carried the numbered window schedule, the hardware and glass schedules, and the test reference for the configured models.
Which systems are on the schedule?
ED-90 Entry Doors, CW-60 Casement Windows — quoted line by line against the elevations. Every system shares one thermal-break platform, so the frame line stays consistent across the façade even where the openings differ.
Which standard applies to this project?
The configured models are tested to the standard of the destination market — Italy — with the report referenced to the models on the order rather than a standing certificate.
How long does a comparable project take?
A complete quotation returns within 24 hours of the inquiry, the shop drawings follow free in 3 working days, and production runs 30–40 days on a standard schedule.


