Aluminium windows and doors for hotels and resorts

A hotel envelope is operated every day: the terrace wall that opens at breakfast, the lounge that has to hold the street out, the pool deck that must shed monsoon rain. Hospitality schedules are written for the service pattern — high-cycle hardware, acoustic zoning by glazing, and maintenance parts listed in the quotation.

daily

operation cycles

45 dB

acoustic zoning target

6 × 6 m

pergola deck coverage

listed

spares in the quotation

Questions we get on this build type

Which systems suit an open-air restaurant wall?+

The LS-60 lift-slide: leaves to 300 kg move on roller bearings with one hand, so a 6,000 mm wall opens for service and closes for weather. Hardware is specified for the service cycle, with the spares list priced into the quotation.

How is acoustic zoning handled?+

By glazing schedule rather than by product line: the catalogue envelope targets 45 dB Rw (EN ISO 10140), so lounges beside a road carry the acoustic build while pool-deck fixed glazing stays on the lighter specification.

What covers a pool deck through monsoon season?+

The LP-120 louvered pergola: a 6 × 6 m louvered roof with integrated gutter and concealed downpipe, closing automatically on the wind sensor and shedding rain when closed.

What does the operator receive at handover?+

A service schedule per amenity deck — screen mesh, gasket line and hinge lubrication on a published cycle — plus the priced spares list and the test references for the configured models.

Other build types

Looking at it from the client side instead? The industries pages cover residential, commercial, hospitality, coastal and healthcare buyers; the solutions pages cover the conditions — hurricane, cyclone, acoustic, large-format.

Send the plan

Request a quote

Elevations or a one-line brief — the quotation returns within 24 hours and the shop drawings follow free in 3 working days.

Prefer to talk it through?

Send a drawing or a one-line brief on WhatsApp.

+86 177 0868 3991 — quotation within 24 hours, shop drawings free in 3 working days.