Solutions

Products are chosen by system, projects by client type, markets by standard. This page works the other way: start from the challenge — the wind, the salt, the noise, the opening — and the systems are already specified to it.

United States

Hurricane & impact

Laminated-core glazing that holds shattered glass in place under projectile and pressure load, on a frame tested to the wind zone. The listing path is coordinated before production, not after.

View details

Rating

Large missile, Cat 3–5 per project test

Listing path

Miami-Dade NOA / FBC via PGT or equivalent

Glass

Laminated IGU, 0.38 SGP interlayer

Lead time

40–55 days

Specified systems

Australia & NZ

Cyclone zones

The same impact platform reconfigured to the AS wind-zone logic: N1–N4 per AS 1170.2, AS 2208 glass selection, AS 1288 laminated core. Specified per elevation, not per house.

View details

Wind zones

AS 1170.2 N1–N4

Glass standard

AS 2208 selection, AS 1288 laminated core

Configuration

IR-80 AU cyclone build

Warranty

15 years

Specified systems

All markets

Coastal & salt fog

A hardware and coating schedule, not a product: 316 stainless fixings, salt-fog-rated powder coat, marine-grade bearings on the sliding systems. Applied to any system in the range on an exposed elevation.

View details

Hardware

316 stainless, salt-fog rated

Coating

Salt-fog hardware and powder-coat schedule

Screens

Stainless mesh, SC-40 MARINE

Warranty

10–15 years by system

Specified systems

Urban projects

Acoustic

Specified to a measured figure, not a style. Asymmetric laminated glazing in a sealed dual-cavity frame with a dedicated acoustic gasket — for arterial roads, airport radii and rail frontages.

View details

Certified

Rw 45 dB, EN ISO 10140-2

Glazing unit

47 dB laminated IGU

Build-up

Asymmetric laminated, 24–42 mm

Airtightness

Class 4 (EN 1026)

Specified systems

South-East Asia

Tropical ventilation

Openings that stay open through the wet season: screen doors on stainless mesh, tilt-turn with flush screen frames, louvered roofs that vent heat before it accumulates. Air in, everything else out.

View details

Mesh

Fibreglass or stainless, 16–19 gauge

Screens

Flush stainless frame on TT-75

Louvres

Motorized, 180° travel, rain auto-close

Lead time

30–40 days

Specified systems

Villas & hospitality

Large-format openings

When the opening is the statement: lift & slide to 6 metres, bi-fold to 8 metres, fixed panes to 4 × 3 metres, a 400 kg pivot leaf on floor and head bearings. Factory-assembled, shipped as one unit.

View details

Lift & slide

6,000 mm opening, 300 kg per leaf

Bi-fold

8 panels, 8,000 mm clear

Fixed pane

To 4,000 × 3,000 mm

Pivot leaf

2,100 × 3,000 mm, 400 kg

Specified systems

All markets

Roof & daylighting

Daylight from the source: skylights on roofs from 5° to 55° pitch with full-perimeter flashing, and sunroom structures that carry the roof load to a 7 metre clear span. Motorized vents close on rain.

View details

Roof pitch

5° to 55°

Skylight leaf

To 1,600 × 1,200 mm

Sunroom span

To 7 m clear, gable/flat/curved

Automation

Motorized tilt, rain sensor, battery hold-up

Specified systems

Smart villas & managed buildings

Smart & automated

Ordinary sashes on an integrated servo: app, switch or voice control, rain-sensor auto-close, and an open API that feeds the building management system. Under 45 dB of operating noise.

View details

Drive noise

Under 45 dB per sash

Control

App, switch, voice, scheduled routines

Safety

Anti-crush force limit, rain auto-close

Integration

Open API for BMS, 12 V / 230 V

Specified systems

Ground floors & entrances

Security & entry

The turn position is the security position: multi-point locking that compresses the sash all round, key-operated handles on ground floors, key deadbolts on entrance doors, and a laminated core that doubles as the glass-break layer.

View details

Locking

6–12 point multi-point, full perimeter

Handles

Key-operated for ground floor

Entry doors

Key deadbolt, FD-60 ENTRY

Glazing

Laminated core, SANS 536 option (Africa)

Specified systems

What every solution page documents

The challenge decides the configuration; the documentation is what you receive with it. Four items, the same list on all nine pages.

Rating on the test report

Impact and wind-zone ratings are verified per project — the document names your sizes and pressures, not a sample window.

Marine schedule on the data sheet

Salt-fog hours, 316 hardware and the coating cycle are written into the specification per elevation.

Service cycle published

Gasket, mesh and hinge replacement on a date you can calendar — the ten-year cost of the opening is a line item.

Quote in 24 hours

Send the schedule; the quotation returns with the lead time stated per system and the test documentation attached.

Who is buying

Three buyer roles carry most of our volume. The entry point differs; the factory and the lead times do not.

Dealer & installer

  • Factory-direct pricing, quotation within 24 hours
  • Factory-assembled sashes — set in place, no on-site joinery
  • Service kits packed in: screen spline, hardware spares

Developer & contractor

  • Project lead times held at 30–55 days by system
  • Impact and cyclone ratings confirmed per project test before production
  • Container loading schedule coordinated against your pour dates

Architect & specifier

  • Shop drawing package with structural schedule
  • Cross-sections and finish tables in the downloads library
  • OEM configuration on the standard 70/75 mm platforms

Asked on every solution enquiry

Can one project mix several solutions?

Yes. The window systems share the 70 mm and 75 mm platforms, so a hurricane-spec elevation, an acoustic street frontage and a motorized top-floor row can sit on the same drawing set. Send the schedule once; we mark the configuration per position.

Are the impact and cyclone ratings standing certificates?

The glazing systems are built to be tested per project — large-missile Cat 3–5 in the US path through PGT or equivalent, and AS 2208 / AS 1170.2 configuration for the Australian path. The listing route is coordinated before production starts, not after.

What do you need to quote a solutions project?

Drawings or a window schedule, or a one-line brief with the location and the challenge. The quotation returns within 24 hours with the lead time stated per system; sample and download material is on the downloads page.