Sourcing custom aluminium windows for the US market
Sourcing custom aluminium windows for the US means building the specification around three things: the listing path your jurisdiction requires (Miami-Dade NOA for the hurricane coast, state energy code for inland), the glass schedule, and the documentation trail your AHJ will ask for. The factory work is the easy part; the paperwork and the port logistics decide whether the project lands on schedule.
Short answer
Sourcing custom aluminium windows for the US means building the specification around the listing path the jurisdiction requires, the Miami-Dade NOA on the hurricane coast and the state energy code inland, and around the glass schedule that path tests. Start from the address, because the address decides which document the inspector will ask for.
Start from the jurisdiction, not the catalogue
A window schedule that works in Savannah may be the wrong product in Palm Beach. The dividing line is the wind zone: inside the HVHZ bands and on the coast, units are impact-rated and carry the Miami-Dade / FBC listing path; inland, the specification is driven by energy code (NFRC values), acoustic needs and budget. Ask your client for the address and the zoning before anything else — the same model number can quote two different products.
The listing path, in order
First, third-party testing: the configured model goes through a PGT-accredited (or equivalent) laboratory for the missile and pressure-cycle criteria. Second, the Miami-Dade NOA — Notice of Acceptance — which is the document the building official in the coastal counties asks for. Third, where the energy code reaches the position, NFRC registration for the U-factor and SHGC of the configured IGU. The sequence matters because the lab test is run on the exact build you will ship, not a catalogue unit.

What a complete RFQ looks like
- A window schedule — sizes, positions, glass per position, hardware side. Even a rough one starts the 24-hour clock.
- Finish: RAL or anodised, with the salt-spray schedule if coastal.
- Destination port: Savannah, Miami, Los Angeles or Houston — we consolidate to the one your drayage runs from.
- Timeline: the order date and the on-site date. Impact-rated schedules carry a longer production lead than standard, and the lab step sits before production, not after it.
The jurisdiction set, by project type
| Project | Governing lines | The extra document set |
|---|---|---|
| Florida, HVHZ county | Fema wind speed, debris zone, door references | The door rating, the closure hardware |
| Florida, standard county | Fema wind speed, energy label line | The label values per configuration |
| US Gulf and East coast | Fema wind speed, local amendment | The zone call per elevation |
| US inland, all regions | Energy label line, standard hardware | The label values, the finish line |
Ports, containers and the last mile
Factory-assembled sashes pack to roughly the same container count as flat-processed units, but they cut site labour: the frame arrives glazed, hung and gasketed, so the installer sets a finished unit instead of building one in the weather. Loading reports per bay and the packing list per crate go out with the shipment, which is what the site agent needs to claim the container and start setting.

One villa, two states — a worked example
Sourcing custom aluminium windows for the US market is not one specification — it is a set of them, one per jurisdiction, and the order is listed to the jurisdiction it ships to. Take the same twelve-window villa: to a southern Florida county it lists at the 160 mph design speed on the current Fema wind-map, with the debris-zone call and the laminated lites; to a Gulf coast Texas county it lists at the 130 mph line, the same window sizes, and the glazing call steps down one category. The frames are identical, the finish is identical, the quotation is not.
The difference is the document set that travels with the order: the Florida pack carries the debris-zone line and the label values for the energy code, the Texas pack carries the zone call and the same label values one step lower. When the RFQ names the jurisdictions, the quotation prices each set separately, and the buyer can see where the money is going before the steel is cut.
What the first delivery carries
The order pack is the compliance set, and on a first US order it is worth listing, because the receiver checks it against the schedule:
- Shop drawings per opening, keyed to the window schedule number.
- The hardware schedule, the handle and the multi-point set per sash.
- The glass schedule, the lite build per elevation with the coating line.
- The test references for the configured models, by standard and clause.
- The energy label values where the market reads the label.
- The packing and the loading plan, crate by crate, sheet by sheet.
The phasing, and what it does to the quotation
A US project rarely lands as one delivery. The villa is phased — the first pour, the second, the roof — and the window schedule follows the pour, not the drawing date. The quotation prices the phasing: each delivery has its own container count, its own document set, and its own lead time, and the Incoterms line runs per delivery, not per project. A schedule that arrives as one lump gets quoted as one lump, and the site ends up waiting on glass for a wall that is not yet framed.
The line that keeps the phasing honest is the delivery sequence on the RFQ: the pour date, the framing date, and the glazing date per phase, with the window delivery called ahead of the framing. The factory schedules the line against that sequence, and the container leaves with the phase it serves, which is the difference between a schedule that holds and one that re-quotes itself every month.
Frequently Asked Questions
Can non-impact windows go to coastal Florida?
Only where the code allows: typically secondary positions, above the 30 ft debris line on some elevations, or with the architect taking the engineering. The drawing office flags each position.
What does the lab step add to the timeline?
It runs before production on the first unit of a model. On a repeat model with an existing report for the same configuration, nothing.
Do you ship DDP?
We quote to port as standard; DDP and site delivery are arranged with our forwarder for the buyer when the client wants it — the schedule and the lead time change, so price both ways.
Can the same window be sold in two different states?
Yes, where the code lines agree — the drawing and the rating travel with the unit. Where the lines differ, usually the wind speed or the debris zone, the specification is adjusted per state, and the order pack states the adjustment.
What is the first document a US buyer should send?
The window schedule or the spec page, with the address and the wind speed. The rest — glazing, finish, hardware — the factory can propose defaults for, but those two fields set the rating, and everything else follows them.
Standards cited
Buying into the United States means naming a code jurisdiction and a rating programme before a unit is quoted. These are the two sources behind the numbers below.
- Florida Building Code — state code, including the wind-borne debris regions. International Code Council
- NFRC ratings — U-factor, solar heat gain and air leakage rating programme. National Fenestration Rating Council