Container loading: how windows actually pack
Container loading of factory-assembled windows runs differently from flat-processed ones, and the difference shows up in the loading report and the crate list. Frames stack on their long edge, assembled sashes ride in their own crate with the glass protected on the face, and the packing is planned so the crate order matches the floor order on site — the agent can claim the container, match a crate to a floor, and start setting the same day.
Short answer
Container loading decides an order as much as the quotation does. Frames stack on their long edge, assembled sashes ride in their own crates, and glass travels vertically in a rack. The loading report and the crate list are what the receiver counts against, so the packing method belongs in the enquiry rather than in the small print.
The two ways a container gets loaded
Flat-processed units load denser: profiles, glass, hardware and gaskets as separate packs, assembled on site. Factory-assembled sashes load as finished units, which is slightly less dense but converts container space into site-hour savings. On a coastal or multi-storey job the assembled route usually wins on total cost even though the flat pack fills more of the box.
How a frame stack works
Frames load on their long edge, interleaved with protection at the corners and along the face, banded so the stack cannot shift in the crossing. The extruded profile is strongest along its length, so the load is carried by the frame, not the mitre. Heavy members — the barrier-free threshold housing, the large fixed stiles — go in their own bundle with the handling marks the crane crew reads.

The crate list and the loading report
Two documents do the work at the dock. The loading report is issued per bay as the container is filled, so the position of every bundle is on the record before the doors close. The crate list runs per crate, matching crate to floor and to the shop drawing, which is what the site agent claims against. If a lite is damaged in transit, the report puts it on the record at the bay, photographed before the unit reaches the opening — which is what the claim runs on.

Two loading methods, one container
| Line | Crated factory-assembled sashes | Flat frame stacks |
|---|---|---|
| What moves | Glazed, hung, gasketed units in crates | Unglazed frames and glass, nested |
| Crate pitch | Set by crate width, 1.1 to 1.8 m typical | Set by stack depth, two to three times denser |
| Site effect | Frame the opening, hang, done | Glazing and hanging completed on site |
| Document | Crate list keyed to the drawing sheet | Stack count in the loading report |
What changes the container count
- Assembled or flat: assembled sashes add the bench work but cost little volume; flat packs denser but moves labour on site.
- The glazing: impact and laminated lites are heavier and travel crated to a higher standard, which affects both the pack and the lifting plan.
- The timber face: wood-aluminium (WA-70) travels with the timber protected against the humidity cycle, which adds wrap and can add a fraction of volume.
- The destination: the same pack loads to a 20 ft or 40 ft box depending on the run, and the packing list is issued to match the container actually booked.
How many windows fit — a worked loading example
The count depends on size, not on the container. A 40 ft high-cube holds roughly 96 crated sashes at 1.1 m width, two per layer, and about half that at 1.8 m width. Flat frame stacks run two or three times the sash count, because the stack depth rather than the crate sets the pitch. When an order mixes both, the sash crates govern the layout and the frames fill the remaining height.
The third variable is the mix within the order: a schedule that is mostly 0.9 m casements loads denser than one that is mostly 2.4 m lift-slide leaves, and the quotation states the container count per mix, not per average. The loading report is the number that governs in the end — it lists the crates per container, the sequence and the position, and the receiving yard checks it against the packing list before the crane moves.
The example numbers above are the shape of the calculation, not a promise. The loading report for the actual order states the count per container from the real crate sizes, and the quotation repeats that stated count so the receiving yard can plan the move against a number on paper, not an estimate that shifts with the mix.
The documents that must match the load
Container loading produces five documents that travel with the load, and the receiver checks them against each other before anything is unloaded:
- Packing list per crate, keyed to the drawing sheet number.
- Loading report per container: crate count, sequence and position.
- Bill of lading matching the crate count, not the plan count.
- Photo report at the loading gate, per container, before the seal goes on.
- Crane plan and ground-bearing note where the receiving yard is paved.
- Seal numbers recorded per container, matched on arrival.
Frequently Asked Questions
Do assembled windows cost more to ship?
Slightly less dense per container, but the site-labour saving usually exceeds the difference. On multi-storey work the delta is visible in the first week.
How is glass protected in the crate?
Sashes travel with the glass set and gasketed in the finished unit, face-protected and banded. Loose lites, where a project ships them separately, ride in a dedicated glass crate on edge.
What happens if a crate is short at the dock?
The per-bay loading report and the crate list reconcile the container against the packing list, so a short or over crate is identified at the dock, before the equipment leaves — which is what keeps the claim clean.
How full does a container need to be to ship?
It does not need to be full — it needs to be stable. A partial load is strapped and braced to the container frame, and the loading report records the bracing, which is what the receiving yard checks on arrival.
What happens if the crate count and the bill of lading disagree?
The yard stops the unload. The count on the bill of lading must match the loading report, and the packing list keys each crate to the drawing sheet — a mismatch on any of the three pauses the job until it is reconciled.
How long does container loading take?
A 40-foot high-cube takes half a day to load and secure, and the container loading report is issued the same day. The crate sequence is set in the packing plan, so the bay fills in the order the receiver will unpack it.



